Phase 2 Metro Station
Rapid Metro Gurugram · Gurugram, Haryana
About Phase 2 metro station
Phase 2 is one of the original stations of the Rapid Metro Gurugram, opened on 14 November 2013. It is elevated and works as the junction of the line’s loop: according to DMRC, the next station towards Sector 55-56 is Sikanderpur, where the Yellow Line connection is made, and the next station the other way is Belvedere Towers.
The loop through Belvedere Towers, Cyber City, Moulsari Avenue and Phase 3 is run one way, so trains returning from Phase 3 come back into Phase 2 before heading on to Sikanderpur. The line is owned by HMRTC and operated by DMRC, having earlier been run by Rapid Metro Gurgaon Limited.
First and last metro at Phase 2
Departure times from this station on a weekday, as DMRC’s journey planner gives them (checked on Tuesday 20 October 2026; the planner takes no date). DMRC does not publish separate Saturday, Sunday or holiday times for each station, and on special days it announces changes in advance. A last train after midnight belongs to the previous evening’s service. “Not published” means DMRC’s own answer was inconsistent (arrival before departure), so we leave it out.
How often trains run at Phase 2
| Section | Weekday peak | Weekday off-peak | Saturday peak | Sunday |
|---|---|---|---|---|
| Rapid whole line | 5 min 20 s | 7 min 20 s | 6 min | 10 min |
Average interval between trains published by DMRC for each section (as on 31.08.2026). Peak hours are 08:00–12:00 and 17:00–21:00, the hours outside DMRC’s off-peak definition. Rapid Metro Gurugram figures come from its own page (peak 08:00–11:00 and 16:00–20:00 on weekdays; Sunday is one flat interval).
Next stations from Phase 2
| Line | Next station | Running time |
|---|---|---|
| Rapid | Sikanderpur | 1.8 min |
| Rapid | Belvedere Towers | 1.5 min |
| Rapid | Phase 3 | 1.7 min |
Running time to the adjoining station from DMRC’s journey planner, including the stop. On the Rapid Metro the Phase 2 – Phase 3 loop runs one way only (Phase 2 → Belvedere Towers → Cyber City → Moulsari Avenue → Phase 3 → Phase 2).
Interchanges and connections
Phase 2 is served by Rapid Metro Gurugram only, and DMRC lists no railway station, bus terminal or airport among the places near it.
Station facilities
DMRC labels: Divyang Friendly Station and Lift/Escalator Available.
As listed on the DMRC station page; a facility missing here may still exist.
Gates and platforms at Phase 2
| Gate | Leads to | Divyang friendly |
|---|---|---|
| Gate No. 2 | Towards Yadav Bus Service Side | Yes |
| Gate No. 1 | Towards Building no-5 | Yes |
Platforms
| Platform | Trains towards |
|---|---|
| Platform No. 2 | Phase 3 |
| Platform No. 1 | Sector 55-56 |
Gates, their surroundings and platforms as DMRC lists them on the station page.
Parking at Phase 2
| Parking | Capacity |
|---|---|
| Not Available | — |
Parking sites and capacities listed by DMRC (some are run by other agencies); rates are not published on the station page.
Fare from Phase 2
A single journey to Rajiv Chowk (Connaught Place) costs ₹74 from Monday to Saturday and ₹63 on Sundays and national holidays, according to DMRC’s journey planner (route on the Rapid Metro and Yellow Line). The planner gives about 55 minutes for the journey. Fares go by distance in six slabs; a smart card or an NCMC card is cheaper than a QR ticket or token. See Metro fares for every slab and discount.
What is near Phase 2 metro station
DMRC describes the gates by what they face: Gate No. 1 towards Building no-5 and Gate No. 2 towards the Yadav Bus Service side. Its list of nearby places has the DLF Phase-2 police station at about 1.3 km, Neelkanth Hospital at about 2.2 km and the Sector 29 fire station at about 4.9 km. OpenStreetMap shows an RWA Park about 240 m from the station.
Within 400 metres (OpenStreetMap)
| Place | Straight-line distance | On foot (estimate) |
|---|---|---|
| RWA Park | 240 m | 4 min |
Named places from OpenStreetMap. The walking time is an estimate (straight-line distance × 1.3).
Frequently asked questions
The Rapid Metro stretch from Phase 2 through Belvedere Towers, Cyber City, Moulsari Avenue and Phase 3 is a one-way loop. Trains leave Phase 2 towards Belvedere Towers and come back into Phase 2 from Phase 3, then continue to Sikanderpur.
Phase 2 opened on 14 November 2013 on the Rapid Metro. It is owned by the Haryana Mass Rapid Transport Corporation and operated by DMRC, and was earlier operated by Rapid Metro Gurgaon Limited.