Delhi Metro Grey Line

Four stations and 4.98 km from Dwarka-Kakrola, on the Blue Line, to Nangli, Najafgarh and Dhansa Bus Stand.

About the Grey Line

Stations
41 interchange
Route
Dwarka-Kakrola – Dhansa Bus Stand
Length
4.98 kmDMRC figure
First section opened
20194 October 2019
Operator
DMRCLine 9

On 20 October 2026 DMRC’s website showed the line as “Normal Service”. That is the only live information DMRC publishes; check it on the day you travel.

DMRC’s Line 9 has four stations, all in South West Delhi. It starts at Dwarka-Kakrola on the Blue Line, its only interchange, and runs through Nangli to Najafgarh and Dhansa Bus Stand. DMRC gives its length as 4.98 km. Dwarka-Kakrola and Nangli are elevated; Najafgarh and Dhansa Bus Stand are underground.

The Grey Line is built to standard gauge, while the Blue Line was built with wider track, and the two meet at no other point. Every journey beyond these four stations therefore involves a change at Dwarka-Kakrola, where the Grey Line platforms sit on the same level as the Blue Line ones.

Stations on the Grey Line

4 stations in DMRC’s order, 1 of them an interchange with another line (marked with a ring and the colours of the other lines).

Dwarka-Kakrola to Dhansa Bus Stand

Main route, 4 stations

Timings and frequency of the Grey Line

On weekdays the first train on the Grey Line leaves at 06:00 and the last one at 23:05 (earliest and latest departures anywhere on the line, DMRC journey planner).

From the end of the lineFirst train (weekdays)Last train (weekdays)
Dwarka-Kakrola → Dhansa Bus Stand06:0023:00
Dhansa Bus Stand → Dwarka-Kakrola06:0023:00

Departure times from this station on a weekday, as DMRC’s journey planner gives them (checked on Tuesday 20 October 2026; the planner takes no date). DMRC does not publish separate Saturday, Sunday or holiday times for each station, and on special days it announces changes in advance. A last train after midnight belongs to the previous evening’s service. “Not published” means DMRC’s own answer was inconsistent (arrival before departure), so we leave it out.

Frequency by section

SectionWeekday peakWeekday off-peakSaturday peakSaturday off-peakSunday peakSunday off-peak
Dwarka – Dhansa Border7 min 30 s12 min7 min 30 s12 min12 min12 min

Average interval between trains published by DMRC for each section (as on 31.08.2026). Peak hours are 08:00–12:00 and 17:00–21:00, the hours outside DMRC’s off-peak definition. Rapid Metro Gurugram figures come from its own page (peak 08:00–11:00 and 16:00–20:00 on weekdays; Sunday is one flat interval).

History

The first section, from Dwarka-Kakrola to Najafgarh with Nangli in between, opened to the public on 4 October 2019. The one-station extension to Dhansa Bus Stand was scheduled for December 2020, but the COVID-19 pandemic delayed construction and it was inaugurated on 18 September 2021.

At Dwarka-Kakrola the interchange was built with five platforms on one level: two for the Blue Line, two for the Grey Line and one that connects the Blue Line with Najafgarh depot. The Grey Line uses the same type of trains as the Pink and Magenta Lines, but its stations were built without platform screen doors.

Najafgarh station has an unusual plan. It was designed as a regular rectangle, but once work began on the ground some of the private land it needed could not be acquired, so DMRC built it on the land that was available. The result is a dumbbell-shaped station whose footprint narrows by a few metres in the middle.

How the service works

One service runs from end to end. DMRC gives an average interval of 7 min 30 s in the weekday peak and 12 minutes off-peak over the whole line. On weekdays the first trains leave Dwarka-Kakrola and Dhansa Bus Stand at 06:00 and the last at 23:00; counting the intermediate stations, trains run until 23:05. At Dwarka-Kakrola the connecting Blue Line trains are far more frequent, every 2 min 51 s in the weekday peak. Journey times between any two stations are on the route planner.

Frequently asked questions

No. The Grey Line is standard gauge and the Blue Line was built with wider track, so every journey between them means changing trains at Dwarka-Kakrola, where the platforms of the two lines are on the same level.

It was planned as a rectangle, but some private land could not be acquired once construction started. DMRC fitted the station into the land it had, so it narrows by a few metres in the middle.

The extension from Najafgarh was due in December 2020, but the COVID-19 pandemic delayed construction. It was inaugurated on 18 September 2021, almost two years after the Dwarka-Kakrola – Najafgarh section opened in October 2019.

Stations, first and last trains, running times, frequencies and fares on this page come from the information the Delhi Metro Rail Corporation (DMRC) publishes on delhimetrorail.com (station pages, journey planner, fare and train-frequency pages), checked on 20 October 2026. metrodelhi.org is an independent guide, not run by DMRC or affiliated with it. Check delhimetrorail.com or the DMRC helpline before you travel.