Delhi Metro Magenta Line

Two sections that do not yet connect: Krishna Park Extension to Botanical Garden, and Deepali Chowk to Majlis Park.

About the Magenta Line

Stations
337 interchanges
Route
Krishna Park Extension – Botanical Garden; Majlis Park – Deepali Chowk
Length
46.86 kmDMRC figure
First section opened
201725 December 2017
Operator
DMRCLine 8

The Magenta Line runs today as two sections that do not connect: Krishna Park Extension – Botanical Garden, and Deepali Chowk – Majlis Park, opened on 8 March 2026. The link between Krishna Park Extension and Deepali Chowk is under construction, so there are no through trains.

On 20 October 2026 DMRC’s website showed the line as “Normal Service”. That is the only live information DMRC publishes; check it on the day you travel.

Under construction and not open: Magenta Line Krishna Park Extension – Deepali Chowk and Majlis Park – R.K. Ashram Marg. These sections are not part of the line on this page.

DMRC’s Line 8 has 33 stations on two separate sections, 46.86 km in all. The longer one, 26 stations, runs from Krishna Park Extension through Janakpuri West, Terminal 1-IGI Airport, Hauz Khas and Kalkaji Mandir to Botanical Garden in Noida. The other, opened on 8 March 2026, has seven elevated stations from Deepali Chowk to Majlis Park. There are no through trains between the two.

From Krishna Park Extension to Kalkaji Mandir all but three stations are underground; Janakpuri West, Sadar Bazar Cantonment and Shankar Vihar are elevated, as is everything from Okhla NSIC to Botanical Garden. Seven stations are interchanges: Janakpuri West and Botanical Garden with the Blue Line, Hauz Khas and Haiderpur Badli Mor with the Yellow Line, Kalkaji Mandir with the Violet Line, Majlis Park with the Pink Line and Madhuban Chowk with the Red Line.

Stations on the Magenta Line

33 stations in DMRC’s order, 7 of them interchanges with another line (marked with a ring and the colours of the other lines).

Timings and frequency of the Magenta Line

On weekdays the first train on the Magenta Line leaves at 05:50 and the last one at 00:04 (earliest and latest departures anywhere on the line, DMRC journey planner).

From the end of the lineFirst train (weekdays)Last train (weekdays)
Krishna Park Extension → Botanical Garden05:5022:50
Botanical Garden → Krishna Park Extension06:0023:00
Majlis Park → Deepali Chowk06:0023:00
Deepali Chowk → Majlis Park06:3023:00

Departure times from this station on a weekday, as DMRC’s journey planner gives them (checked on Tuesday 20 October 2026; the planner takes no date). DMRC does not publish separate Saturday, Sunday or holiday times for each station, and on special days it announces changes in advance. A last train after midnight belongs to the previous evening’s service. “Not published” means DMRC’s own answer was inconsistent (arrival before departure), so we leave it out.

Frequency by section

SectionWeekday peakWeekday off-peakSaturday peakSaturday off-peakSunday peakSunday off-peak
Botanical Garden – Krishna Park Extension5 min 20 s6 min 05 s5 min 48 s6 min 42 s6 min 25 s6 min 25 s
Krishna Park Extension – Janakpuri West10 min 40 s12 min 10 s11 min 36 s13 min 24 s12 min 50 s12 min 50 s
Majlis Park – Deepali Chowk5 min 20 s6 min 20 s5 min 20 s6 min 20 s5 min 20 s6 min 20 s

Average interval between trains published by DMRC for each section (as on 31.08.2026). Peak hours are 08:00–12:00 and 17:00–21:00, the hours outside DMRC’s off-peak definition. Rapid Metro Gurugram figures come from its own page (peak 08:00–11:00 and 16:00–20:00 on weekdays; Sunday is one flat interval).

History

The Magenta Line was built in Phase 3 and was due for completion in December 2016, but difficult tunnelling pushed the date back. Trial runs began in August 2017, and the first section, 8.679 km with nine stations from Botanical Garden to Kalkaji Mandir, opened on 25 December 2017. The rest of the Phase 3 line, 24.82 km on to Janakpuri West, was inaugurated on 28 May 2018 and opened to passengers the next day. At Dabri Mor – Janakpuri South two parallel tunnels were bored at the same time, and Hauz Khas station lies 29 metres below ground.

Phase 4 has so far added two pieces. A 2.8 km stretch from Janakpuri West to Krishna Park Extension opened on 5 January 2025, and the seven-station Deepali Chowk – Majlis Park section, tested with new Alstom Metropolis trains from November 2025, opened on 8 March 2026. Near Haiderpur Badli Mor its viaduct reaches 28.362 metres above the ground at pier 340. In its press releases of February and July 2026 DMRC described the links from Krishna Park Extension to Deepali Chowk and from Majlis Park to Ramakrishna Ashram Marg as under construction; until they open, the two sections run separately.

How the service works

On the main section DMRC’s average interval between Botanical Garden and Janakpuri West is 5 min 20 s in the weekday peak and 6 min 05 s off-peak. The short stretch on to Krishna Park Extension is worked as a single-line section and gets half that service, a train every 10 min 40 s in the peak and 12 min 10 s off-peak. The Deepali Chowk – Majlis Park section has a train every 5 min 20 s in the peak and 6 min 20 s off-peak. On weekdays the first trains leave the four ends between 05:50 (Krishna Park Extension) and 06:30 (Deepali Chowk), and the last between 22:50 and 23:00.

The trains

The Deepali Chowk – Majlis Park section is worked by new Alstom Metropolis trains from Mukundpur depot, which was upgraded to maintain Magenta Line trains as well as Pink Line ones. On the main section, the stretch to Krishna Park Extension was at first served by a single modified Hyundai Rotem train running as a shuttle, with its first and last coaches closed to passengers. That shuttle has since given way to through trains: every alternate train from Botanical Garden now continues to Krishna Park Extension.

Frequently asked questions

Not on one train. The two Magenta Line sections are not yet connected, so the journey needs changes on other lines. Our route planner works out the combination for any pair of stations.

Yes, Terminal 1. Terminal 1-IGI Airport, an underground station between Sadar Bazar Cantonment and Shankar Vihar, is on the main section. The Airport Express Line serves a different stop, Airport (T-3).

The 2.8 km stretch from Janakpuri West is worked as a single-line section, so only every alternate train from Botanical Garden continues there. DMRC’s frequency figures for it are double those of the rest of the main section.