Kirti Nagar Metro Station
Blue Line and Green Line · Central Delhi, Delhi
About Kirti Nagar metro station
Kirti Nagar is a terminus of the Green Line and a through station on the Blue Line.
Kirti Nagar opened on the Blue Line on 30 December 2005 and became an interchange on 27 August 2011, when a 3.41 km branch of the Green Line was opened from here to Ashok Park Main. It is one of the Green Line’s terminals: trains run from Kirti Nagar through Ashok Park Main to Brig. Hoshiar Singh.
The station has four platforms, two for each line, and a single gate, which DMRC labels Furniture Market. On the Blue Line it sits between Moti Nagar and Shadipur; the only Green Line neighbour is Satguru Ram Singh Marg. The station serves Kirti Nagar along with Moti Nagar, Shadipur, Naraina and Karampura.
First and last metro at Kirti Nagar
Departure times from this station on a weekday, as DMRC’s journey planner gives them (checked on Tuesday 20 October 2026; the planner takes no date). DMRC does not publish separate Saturday, Sunday or holiday times for each station, and on special days it announces changes in advance. A last train after midnight belongs to the previous evening’s service. “Not published” means DMRC’s own answer was inconsistent (arrival before departure), so we leave it out.
How often trains run at Kirti Nagar
Average interval between trains published by DMRC for each section (as on 31.08.2026). Peak hours are 08:00–12:00 and 17:00–21:00, the hours outside DMRC’s off-peak definition. Rapid Metro Gurugram figures come from its own page (peak 08:00–11:00 and 16:00–20:00 on weekdays; Sunday is one flat interval).
Next stations from Kirti Nagar
| Line | Next station | Running time |
|---|---|---|
| Blue | Moti Nagar | 2 min |
| Blue | Shadipur | 1.9 min |
| Green | Satguru Ram Singh Marg | 2.1 min |
Running time to the adjoining station from DMRC’s journey planner, including the stop. On the Rapid Metro the Phase 2 – Phase 3 loop runs one way only (Phase 2 → Belvedere Towers → Cyber City → Moulsari Avenue → Phase 3 → Phase 2).
Interchanges and connections
- Metro: interchange between the Blue Line and Green Line inside the station, without leaving the paid area (DMRC does not publish walking times between platforms).
Station facilities
DMRC labels: Divyang Friendly Station, Parking Available and Lift/Escalator Available.
As listed on the DMRC station page; a facility missing here may still exist.
Gates and platforms at Kirti Nagar
| Gate | Leads to | Divyang friendly |
|---|---|---|
| Gate No. 1 | Furniture Market | Yes |
Platforms
| Platform | Trains towards |
|---|---|
| Platform No. 3 | Brig. Hoshiar Singh |
| Platform No. 2 | Dwarka Sector 21 |
| Platform No. 1 | Noida Electronic City or Vaishali |
Gates, their surroundings and platforms as DMRC lists them on the station page.
Parking at Kirti Nagar
| Parking | Capacity |
|---|---|
| Near Gate No. 1 | 154 cars, 578 two-wheelers, 58 cycles |
| Infront Of Dmrc Parking | 30 cars, 25 two-wheelers |
Parking sites and capacities listed by DMRC (some are run by other agencies); rates are not published on the station page.
Fare from Kirti Nagar
A single journey to Rajiv Chowk (Connaught Place) costs ₹32 from Monday to Saturday and ₹21 on Sundays and national holidays, according to DMRC’s journey planner (route on the Blue Line). The planner gives about 15 minutes for the journey. Fares go by distance in six slabs; a smart card or an NCMC card is cheaper than a QR ticket or token. See Metro fares for every slab and discount.
What is near Kirti Nagar metro station
Gate 1 takes its name from the furniture market, though DMRC’s entries for it give 1.0 km in one place and 1.6 km in another. DMRC also lists Acharya Shri Bhikshu Hospital at 1.9 km and the Kirti Nagar police station at 2.5 km. OpenStreetMap shows no named places within 400 m.
Places DMRC lists near the station
| Place | Type | Distance | On foot |
|---|---|---|---|
| Furniture Market | Market | 1.6 km | 20 min |
| Furniture Market | Tourist Place | 1 km | — |
Frequently asked questions
They run through Ashok Park Main to Brig. Hoshiar Singh. The other Green Line branch starts at Inderlok, so to reach Inderlok from Kirti Nagar you change trains at Ashok Park Main.
On 27 August 2011, as a 3.41 km branch between Kirti Nagar and Ashok Park Main. The Blue Line station had already been open since 30 December 2005, so Kirti Nagar spent more than five years as a Blue Line stop before becoming an interchange.