Krishna Park Extension Metro Station
Magenta Line · West Delhi, Delhi
About Krishna Park Extension metro station
Krishna Park Extension is a terminus of the Magenta Line.
Krishna Park Extension was scheduled to open in August 2024 but passenger services began on 5 January 2025, when DMRC opened the section from Janakpuri West. It is a Phase 4 station, underground with an island platform, and the end of the line for the Magenta Line section that runs from here to Botanical Garden.
For its first months a single train shuttled between Janakpuri West and Krishna Park Extension, because there were no reversal facilities. That train was unusual: its driver cars, the first and sixth coaches in the direction of travel, were closed off and kept for staff. As of April 2026 that arrangement was removed and trains now run over the whole route. DMRC has not yet published a description of the station; its two gates are labelled DDA Park and Guru Nanak Nagar.
First and last metro at Krishna Park Extension
| Line and direction | First train weekdays | Last train weekdays |
|---|---|---|
| Magenta towards Botanical Garden (next: Janakpuri West) | 05:50 | 22:50 |
Departure times from this station on a weekday, as DMRC’s journey planner gives them (checked on Tuesday 20 October 2026; the planner takes no date). DMRC does not publish separate Saturday, Sunday or holiday times for each station, and on special days it announces changes in advance. A last train after midnight belongs to the previous evening’s service. “Not published” means DMRC’s own answer was inconsistent (arrival before departure), so we leave it out.
How often trains run at Krishna Park Extension
| Section | Weekday peak | Weekday off-peak | Saturday peak | Sunday |
|---|---|---|---|---|
| Magenta Botanical Garden – Krishna Park Extension | 5 min 20 s | 6 min 05 s | 5 min 48 s | 6 min 25 s |
Average interval between trains published by DMRC for each section (as on 31.08.2026). Peak hours are 08:00–12:00 and 17:00–21:00, the hours outside DMRC’s off-peak definition. Rapid Metro Gurugram figures come from its own page (peak 08:00–11:00 and 16:00–20:00 on weekdays; Sunday is one flat interval).
Next stations from Krishna Park Extension
| Line | Next station | Running time |
|---|---|---|
| Magenta | Janakpuri West | 12 min |
Running time to the adjoining station from DMRC’s journey planner, including the stop. On the Rapid Metro the Phase 2 – Phase 3 loop runs one way only (Phase 2 → Belvedere Towers → Cyber City → Moulsari Avenue → Phase 3 → Phase 2).
Interchanges and connections
- Airport: Great Gtb Hospital (0.9 km, about 5 min on foot), as listed by DMRC.
Station facilities
DMRC labels: Divyang Friendly Station and Lift/Escalator Available.
As listed on the DMRC station page; a facility missing here may still exist.
Gates and platforms at Krishna Park Extension
| Gate | Leads to | Divyang friendly |
|---|---|---|
| Gate No. 1 | DDA PARK | — |
| Gate No. 2 | GURU NANAK NAGAR | — |
Platforms
| Platform | Trains towards |
|---|---|
| Platform No. 1 | Janakpuri West or Botanical Garden |
Gates, their surroundings and platforms as DMRC lists them on the station page.
Fare from Krishna Park Extension
A single journey to Rajiv Chowk (Connaught Place) costs ₹43 from Monday to Saturday and ₹32 on Sundays and national holidays, according to DMRC’s journey planner (route on the Magenta Line and Blue Line). The planner gives about 53 minutes for the journey. Fares go by distance in six slabs; a smart card or an NCMC card is cheaper than a QR ticket or token. See Metro fares for every slab and discount.
What is near Krishna Park Extension metro station
Keshopur District Park, about 250 m away according to OpenStreetMap, is the only named place within 400 m, and Gate 1 is labelled for a DDA park. DMRC lists Lal Market at 0.8 km, Keshopur Mandi at 1.0 km and the PVR complex in Vikaspuri at 1.3 km.
Places DMRC lists near the station
| Place | Type | Distance | On foot |
|---|---|---|---|
| Lal Market | Mall | 0.8 km | 9 min |
| Pvr Complex Vikaspuri | Locality | 1.3 km | 14 min |
| Keshopur Mandi | Market | 1 km | 11 min |
Within 400 metres (OpenStreetMap)
| Place | Straight-line distance | On foot (estimate) |
|---|---|---|
| Keshopur District Park | 250 m | 4 min |
Named places from OpenStreetMap. The walking time is an estimate (straight-line distance × 1.3).
Frequently asked questions
Because the station had no reversal facilities when it opened, a single train ran back and forth between the two stations, with its driver cars (the first and sixth coaches) closed to passengers. As of April 2026 the arrangement was removed and trains run over the whole route.
On 5 January 2025, when DMRC started passenger services on the Janakpuri West–Krishna Park Extension section, announced in its press release of 4 January 2025. The station had originally been scheduled to open in August 2024.